Excavation nearly complete. Sitting on bedrock. ~Mid May 15

Footer form work in place

Footers now poured

Overhead of footers for both garage and house

Foundation form work going up

Foundation form work

Foundation ready to pour

Foundation being poured (17 Jun 15)

Forms stripped and first floor deck going on

First floor deck almost complete

First bent in great room going up using a telehandler

First bent almost up. It\'s a king post with continuous chord

First bent being preassembled on first floor deck

Additional bents are up for the great room, loft, kitchen

Additional frame elements going up

Interior frame almost comlete

First SIPs going on

Right side SIPs- kitchen eat-in bump out and dining room

back of house SIPs going on

Second floor system being installed. Used, vice just T&G, to allow space for pot lights and plumbing/electric runs

Wall SIPs mostly complete, T&G ceilings being installed prior to roof SIPs

T&G in loft

Roof SIPs being installed over ceiling T&G

More roof SIPs over T&G

Siding felt being applied

Roof SIPs mostly complete and siding felt on

Garage going up while preparation for lower level slab being made

Lower level slab almost ready to pour. PEX for radiant heat still needs to be installed

House sits on a 4.5 acre lot with a winter view of Cayuga Lake. The greatroom is oriented that way. The kitchen eat-in is positioned to catch the morning sun

Do you have a Client Login Account?

Enter your email and password to upload your project photos to your gallery.


Join The Woodhouse® Newsletter

CLIENT GALLERIES